• Meadowridge Re-designed Pool Shape Step Entry
  • meadowridge pool renovation new pool fibreglass lining
  • Meadowridge Poolside Coping & Resign Non-slip Pool Surfacing
  • meadowridge pool renovation Marbelite Pool Made Smaller
  • Meadowridge Glass Pool Mosaic Tiles Applied To Sides Of

Small Pools, Meadowridge

This Marbelite pool was made smaller and re-designed to include a new shape and new step entry area. New poolside coping was applied.

POOL RENOVATION INCLUDED:

  • Preparation of the pool surface (original and newly built) for a Fibreglass lining.
  • Application of glass mosaic tiles to the sides of the pool and the step entry area.
  • Non-slip surfacing was also applied to the step entry area.
  • The skimmer box (weir) and aimflow (return line) were replaced and re-positioned.
  • The existing pump and filter were re-housed in a convenient position relevant to the new smaller pool.

Why Is There A Waiting Period Between The  Re-Build Work And Application Of The New Fibreglass Lining?
This is to allow moisture trapped in the building mixes to leach out naturally. Moisture trapped in the host surface will be drawn into the new lining and could cause discolouration on the pool surface.

HOW LONG DOES A SMALLER POOL RENOVATION TAKE US?

►  No two pool renovations necessarily take the same amount of time.
►  Each renovation is different dependant upon the factors pertaining to that particular pool.

FACTORS THAT INFLUENCE THE TIME TAKEN INCLUDE:-

  • Size, depth and, the shape of the pool.
  • Ease of access/ positioning of the porta pools relative to where the pool is situated.
  • Issues related to the pool superstructure that may be uncovered once all the water is pumped out.
  • The repair work that is required to address the issues related to the pool superstructure including
    curing latent water ingression.
  • Additional work such as the installation of new suction and return lines, replacement of the pump
    and filter, installation of a salt chlorinator, installation of a backwash water saving mechanism also
    impacts the time taken to complete the reno.
  • Application of new pool tiles such as ceramic mosaic pool tiles and the amount of tiling work required.
Generally, smaller pool renovations take between 5 and 8 working days to complete.

► We personally supervise all jobs both big and small. So, if you have any problems with your pool,
contact Reedworth Pool Renovation to get a free on-site evaluation.

AREAS WE RENOVATE & SERVICE?

Our extensive experience over 20 years helping clients with pool renovations and maintenance makes us the company to call.
We pride ourselves on excellent service, therefore every customer gets and is guaranteed the best service.

If you reside in a suburb or town not mentioned below please give Malcolm a call (083 521 8271)
and we will see how we can help you.


► SOUTHERN SUBURBS AND SURROUNDS:-

√  Pinelands | √ Observatory | √ Rosebank | √ Rondebosch | √ Newlands | √ Claremont | √ Kenilworth | √ Bishopscourt
√ Constantia | √ Wynberg | √ Plumstead | √ Bergvliet | √ Tokai | √ Lakeside | √ Meadowridge | √ The Vines | √ Dennendal
√ Barbarossa and Deurdrif.


► We ALSO SERVE:-

√ Hout Bay | √ Noordhoek.

  • Area: Meadowridge
  • Pool Type: Small Pool
  • Renovation: Re-size & Re-line Pool, New Poolside Coping
  • Volume In Liters: 25,000