• Marbelite swimming pool with aged worn surface with faded pool mosaics
  • The pool surface was sanded down and the new Fibreglass lining in light blue was applied. Ceramic pool mosaics were applied around the circumference of the pool and on the step area.
  • The pool surface was sanded down and the new Fibreglass lining in light blue was applied.
  • A l.e.d. blue retro-fit pool light was installed. The glass filter medium in the pool filter was replaced with conventional pool filter sand.
  • A l.e.d. blue retro-fit pool light was installed. The glass filter medium in the pool filter was replaced with conventional pool filter sand.
  • Ceramic pool mosaics were applied around the circumference of the pool and on the step area.

Meadowridge, New Fibreglass

This Marbelite swimming pool had an aged and worn surface and faded pool mosaics.

POOL RENOVATION INCLUDED:

  • Storage of the pool water in our installed Porta Pools for the duration of the Pool re-lining.
  • The pool surface was sanded down and the new Fibreglass lining in light blue was applied.
  • Ceramic pool mosaics were applied around the circumference of the pool and on the step area.
  • A l.e.d. blue retro-fit pool light was installed.
  • The glass filter medium in the pool filter was replaced with conventional pool filter sand.

HOW LONG DOES A SMALLER POOL RENOVATION TAKE US?

►  No two pool renovations necessarily take the same amount of time.
►  Each renovation is different depending upon the factors pertaining to that particular pool.

FACTORS THAT INFLUENCE THE TIME TAKEN INCLUDE:-

  • Size, depth, and, the shape of the pool.
  • Ease of access/ positioning of the porta pools relative to where the pool is situated.
  • Issues related to the pool superstructure may be uncovered once all the water is pumped out.
  • The repair work that is required to address the issues related to the pool superstructure including
    curing latent water ingression.
  • Additional work such as the installation of new suction and return lines, replacement of the pump
    and filter, installation of a salt chlorinator, installation of a backwash water saving mechanism also
    impacts the time taken to complete the reno.
  • Application of new pool tiles such as ceramic mosaic pool tiles and the amount of tiling work required.
Generally, smaller pool renovations take between 5 and 8 working days to complete.

► We personally supervise all jobs both big and small. So, if you have any problems with your pool,
contact Reedworth Pool Renovation to get a free on-site evaluation.

AREAS WE RENOVATE & SERVICE?

Our extensive experience of over 20 years of helping clients with pool renovations and maintenance makes us the company to call.
We pride ourselves on excellent service, therefore every customer gets and is guaranteed the best service.

If you reside in a suburb or town not mentioned below please give Malcolm a call (083 521 8271)
and we will see how we can help you.


► SOUTHERN SUBURBS AND SURROUNDS:-

√  Pinelands | √ Observatory | √ Rosebank | √ Rondebosch | √ Newlands | √ Claremont | √ Kenilworth | √ Bishopscourt
√ Constantia | √ Wynberg | √ Plumstead | √ Bergvliet | √ Tokai | √ Lakeside | √ Meadowridge | √ The Vines | √ Dennendal
√ Barbarossa and Deurdrif.


► We ALSO SERVE:-

√ Hout Bay | √ Noordhoek.

  • Area: Meadowridge, Cape Town
  • Pool Type: Mid Size Pools
  • Renovation: New Fibreglass Lining
  • Volume In Liters: 55,000